Skip to main content
Getz EMP

Fleet electrification

Electrify in stages, on measured charging cost

Start with a handful of electric vehicles under clear charging rules. Every session records its kWh and cost against the driver and the vehicle, so each next stage of the switch is decided on your own figures rather than estimates.

A staged switch

How fleets usually electrify with Getz EMP

  1. Step 1: First vehicles

    One fleet, one policy and a corporate account for the first electric vehicles.

  2. Step 2: Mix of charging

    Depot, public and home charging under one set of rules and one statement.

  3. Step 3: Measure

    Statements, receipts and the finance CSV show kWh and cost per session, driver and vehicle.

  4. Step 4: Scale

    Add fleets per depot or region as the business case holds, each with its own manager.

Plan the first stage

What to record at one depot before you expand

A worksheet for your own figures. Agree the expansion criteria before the first month starts, then check them against the statement and the finance CSV.

  • Duty cycle

    For each vehicle: daily distance, shift pattern and the hours it is parked at the depot.

  • Charger access

    Which depot and public sites company charging may use, who operates them and who decides access to each site.

  • Energy and cost

    kWh and cost per session, driver and vehicle, from the statement and the CSV.

  • Exceptions

    Refused starts and their reasons, sessions outside the policy and any home charging claimed.

  • Expansion criteria

    The cost per km, refusal rate or depot capacity your team sets as the bar for adding the next vehicles.

  • Who decides

    The fleet manager, finance lead and site owner who sign off the next stage.

Be precise

What Getz EMP covers, and what it does not

Scope of Getz EMP in a fleet electrification programme
CapabilityGetz EMP
Driver access, policies and company-paid charging Yes
Corporate accounts, credit limits and monthly statements Yes
Home-charging reimbursement Yes
Depot and public charging through Getz Hub Yes
Operating depot chargers and their power limitsNoThe charge point operator
Vehicle selection and total-cost-of-ownership modellingNoNot part of the platform
Fleet emissions reporting Coming soonComing soon

Coming soon for electrifying fleets

Next for fleet reporting.

  • Coming soon

    Fleet emissions reports from measured charging energy and published grid factors

    Built on the measured kWh of each session and published grid emission factors.

  • Coming soon

    Cost centres for allocating fleet charging inside a company

    Allocate charging to cost centres inside one corporate account.

Plan your first electric fleet with us

Bring your first vehicles and depots. We set up a demo fleet and walk through a month of charging and its statement.